Our process

1. Consultation and definition

The process starts with the family's needs, municipality, lot availability and anticipated budget. Identify bedrooms, outdoor spaces and accessibility requirements. Gather property documents and existing drawings to support the initial assessment.

2. Assessment and design

Site conditions, access, utilities and restrictions are reviewed. Appropriate professionals develop architectural and structural solutions and determine which studies are needed. Layout and material alternatives are compared before the scope is finalized.

3. Permits and contract

Before starting work that requires authorization, applicable permits must be obtained through OGPe or the responsible municipality. The written agreement should specify scope, price, schedule, payments, responsibilities, insurance and change procedures. Timing depends on approvals and actual project conditions.

4. Site preparation and structure

Construction may begin with clearing, layout, earthwork and temporary drainage. Foundations and structural elements are then built according to approved drawings. Required inspections should be coordinated before covering elements that need review. Site access and material storage should be planned to support safe, orderly work.

5. Building systems and finishes

Electrical, plumbing and other systems are coordinated with the structure. Waterproofing, windows, doors, wall coverings and finishes are installed according to agreed specifications. Changes should be documented so their effect on the budget and schedule is understood. Product selections should be confirmed before ordering to avoid unnecessary delays.

6. Review and handover

Before handover, the contracted scope is reviewed, outstanding items are identified and relevant documents and maintenance instructions are gathered. Applicable final inspections and authorizations are arranged. Communication throughout the process helps resolve questions and maintain a record of decisions. Each project may require a different sequence depending on the lot, design and requirements of the authorities. The written agreement should establish how completion and any remaining work will be documented.